Product
Increased quality
Reduced time
Object manager
Linear referencing system
Relations
Multi-disciplinary
Tables
Table editor
Model check
3D
Level of detail
Sighting
BIM annotations
Stages
Braking curves
Clash control
Fouling point
BIM database
Assist
Audit |
RailCOMPLETE® simplifies the railway infrastructure planning process. Complex BIM data are held in one place, to be re-used at all steps of the planning and construction process. The use of RailCOMPLETE…
- Reduces society’s spending on infrastructure planning
- Increases planning accuracy
- Reduces the number of construction errors and change orders
- Results in increased data quality in the asset management database for infrastructure in revenue operation
Product video (2022-11-08, 10 min.)
Product presentation (4p, PDF)
Introduction to RailCOMPLETE v2021.0 (70p, PDF)
Demo (Norwegian, 1h:45m) of track model and signaling model with interlocking train route tables
Demo (silent, 0h:3m) of a BIM model built in 3 minutes from the French SNCF’s infrastructure database ‘Gaïa’, using a RailCOMPLETE Lua script
Requirement specification (82p, PDF)
Service Level Agreement (4p, PDF) |